Skip to content
How we work

Five phases. Same engineers throughout.

Senior-led delivery, SLO-anchored milestones, and production handover. No junior parachute teams. No slide-deck milestones.


From brief to production

01

Architecture reviewWeek 1–2

A senior engineer reviews your environment, threat model, and compliance constraints. We identify the failure states first — including ours.

Scope document + risk register
02

Foundation sprintWeek 2–4

Data pipeline architecture, security boundary design, and infrastructure-as-code baseline. Observable, testable components from day one.

Running infrastructure + observability baseline
03

Core deliveryWeek 4–16

Iterative delivery in two-week sprints with working software at each milestone. Every sprint ends in a deployed, observable system — not a presentation.

Running production components per sprint
04

StabilisationWeek 14–18

SLA validation under realistic load. Alert tuning, runbook creation, and documentation your team can operate without us.

SLA evidence + operational runbooks
05

HandoverWeek 16–20

Architecture documentation, incident playbooks, monitoring dashboards, and a 30-day hypercare period. Same engineers who built — run knowledge transfer.

Architecture docs + 30-day hypercare

How we make decisions

SLOs before build

We agree success criteria — latency, uptime, alert reduction — before we write a line of production code.

Senior engineers stay

The engineer reviewing your brief deploys to production. We do not use engagements as training grounds.

Security by design

Detection, access control, encryption, and evidence trails are in the first design pass. Not a phase.

Observable from the start

Every component is instrumented before production. When something breaks at 2am, your team has traces — not a phone call.

Compliance as architecture

Data residency, audit trails, PII handling are first-class engineering constraints, not post-build checklists.

Production or we stop

A milestone is not complete until the system is deployed, observable, and meeting its agreed SLOs.


Engagement questions

Do you work fixed-price or time-and-materials?

Both models are available depending on scope clarity. For well-defined programmes, fixed-price with agreed change control. For exploratory work, time-and-materials with monthly delivery reviews.

What happens if we need to change scope mid-delivery?

Scope changes are managed through a lightweight change control process — we document, assess impact, and agree before proceeding. No surprise charges.

What is included in the architecture review?

Environment assessment, threat model, integration points, performance and reliability requirements, and a delivery scope definition with agreed KPIs.

What does hypercare look like after handover?

A 30-day period of prioritised response for production issues. Delivery team remains available for incident support and runbook clarification.

See case studies for proof.

Five phases, production outcomes, honest constraints. Read the case studies, then compare to your situation.

Get started

Leave your email - we'll reach out.

Share your work email and we'll follow up with a tailored note on security, AI, or data programmes - usually within one business day.

No spam. We only use your email to respond to this request.

Explore services →